Summer Lift Schedule
***PLEASE READ ALL IMPORTANT INFORMATION BELOW ON PERIODIC CLOSURES AND SAFETY INFORMATION! Closure Information: Keystone Bike Park is open, seven days a week from 9am-5pm through September 1st, with the exception of a handful of construction closures. Important Information: The upgraded River Run Gondola will follow the same alignment as the existing gondola with the top terminal located in the same location at the summit of Dercum Mountain. A new mid-station will be constructed halfway up Dercum Mountain with loading and unloading in both directions, giving skiers and snowboarders an option to access the upper trails from mid-mountain and to download at the end of their ski day. The new cabins were designed with passenger comfort in mind with floor-to-ceiling windows providing the best possible view and with room to accommodate skis and snowboards inside the cabin. Additionally, the new gondola will offer level walk-in heated load and unload stations to provide convenient access for wheelchairs, mountain bikes, strollers, sight seers, mountaintop tubing hill guests and night-time dining guests. With a vertical rise of 2,307 feet and a top-to-bottom average trip time of less than 12 minutes, the new eight-passenger River Run Gondola will transport about 2,400 people per hour, more than twice the current level. Keystone plans to operate the new River Run Gondola winter and summer.
|